国产精品三级国产∨_網友分享精品日韩一区二区三区视频心得_柚子视频最新免费版在线观看_黄色国产激情视频在线观看_亚洲激情小说中文字幕_日本韩国欧美精品_黄片日韩欧美一级_国产性爱精品在线观看_东京热加勒比久久综合_女人18片毛片60分钟农村

Kefengyuan Home > News > Industry news >

Products

Industry news

Analysis of water pressure test method for water supply pipe

Release time:2018-10-22 13:29

Pipe and fittings can be connected by hot melt socket, hot melt butt joint and electric melt, so that the pipe and fittings are fused into one, the system is safe and reliable, the construction cost is low, and the engineering application is developing rapidly. The vigorous promotion of PE pipe conforms to the guidelines of the Ministry of Construction and the State Economic and Trade Commission for the development of chemical building materials, and meets the requirements of the development of people's living standards.
The water supply equipment manufacturer also mentioned the PE pipe hydrostatic test measures:
1. Water pressure test requirements:
Hydraulic test is qualified for installation and acceptance of PE pipeline in each section, and pressure test can be carried out only at the elbow, the length of l2m on both sides of tee and 5 Ocm above the pipe top. In order to prevent pipeline displacement, the pipeline pressure test standard of this project is 0.8 Mpa. The pipeline strength test is qualified when the pressure is stable and the interface is checked.


給水管設(shè)備

2, pressure test methods and measures:
(1) use fire hydrant to fill water at low point by fire belt, and total water consumption should be adjusted according to actual length.
_when the beginning of water injection, first open the exhaust valve, after the exhaust valve to close the water injection valve exhaust valve to start pressure testing.
_After the test pipe is filled with water, keep a certain water pressure to soak fully, press soak for not less than 12 hours, and check whether there is leakage phenomenon in the joint.
3. Pressure test schedule.
According to construction requirements, the time needed for pressing is 1 to 2 days.


Tel

Top